Manufacturing of a Product

First Stage

It includes assembling of Printed circuit board which are hand soldered and inspected through a magnifying glass to avoid any dry solder or residue flux.

Second Stage

It includes instruments sub assembling, Testing and calibration.

Third Stage

It includes on load testing for 72 hours and functional check is performed with a test report of QC Sticker affixed to the instrument.

Service

We have a team of hardware engineers for quick maintenance.

Site designed and maintained by Prime Control System